Main Page: Difference between revisions

From wiki convadis
Jump to navigation Jump to search
No edit summary
No edit summary
Line 33: Line 33:
*July 30. 2021: Switching off TLS1.0 and 1.1 support in CCom. Reason: These crypto prococols outdated.
*July 30. 2021: Switching off TLS1.0 and 1.1 support in CCom. Reason: These crypto prococols outdated.
*August 2. 2021: Switch one of the 2 workers off inside the cluster for the time between 09:50 and 10:10 (GSMT+2) to test emergency load situation with all systems running. Pccom, iccom, kccom: 2..3 min downtime.
*August 2. 2021: Switch one of the 2 workers off inside the cluster for the time between 09:50 and 10:10 (GSMT+2) to test emergency load situation with all systems running. Pccom, iccom, kccom: 2..3 min downtime.
*August 9. 2021 08:05 (GMT +2): Update pccom (Productive  instance). 2..3 min downtime.

Revision as of 18:20, 30 July 2021

C-Compact2-compr.jpg C-touch front with reservation Web.jpg
Welcome to Convadis Wiki. The knowledge base for the Carsharing systems of Convadis.
The wiki contains most of the information about our products. There may still be some small bugs and some info may be missing. We will contiuosly improve it. Please help us, by sending your comments to support@convadis.ch. Thank you!
Good translators/Überstzung: https://www.deepl.com or http://translate.google.com

Take a look by browsing through the menu tree.


Status Info of our communication servers (CCOM): also see Emergency contact info
Access monitoring Page

  • PCCOM (Productive convadis instance): System running. 2021-06-16 07:37(GMT+1)[Spu].
  • MCCOM (Private system): System running 2021-07-27 02:30. (GMT+1) [Spu].
  • KCCOM (Private system): System running 2021-07-26 08:07. (GMT+1) [Spu].
  • ICCOM (Integration test system): Systems running. 2021-05-03 10:05. (GMT+1) [Spu].


Planed actions:

  • July 30. 2021: Switching off TLS1.0 and 1.1 support in CCom. Reason: These crypto prococols outdated.
  • August 2. 2021: Switch one of the 2 workers off inside the cluster for the time between 09:50 and 10:10 (GSMT+2) to test emergency load situation with all systems running. Pccom, iccom, kccom: 2..3 min downtime.
  • August 9. 2021 08:05 (GMT +2): Update pccom (Productive instance). 2..3 min downtime.